In October, work continued at Shillingstone and Plymouth.
Refurbishment of 30076's tool box and a sander dome continued. 30076’s cab continued to be dismantled, and in the firebox, grinding the welds off the boiler tubes continued. A pair of refurbished safety valves for 30076 have been purchased.

Loco 30075 currently resides at Plym Valley Railway, and the need to jack it up to carry out a repair to a spring hanger has led to us organising suitable jacks. 30076 has been inspected to identify suitable jacking points.
The fitting of new studs to the 30076’s lefthand water tank was finished and the tank painted in grey primer/undercoat. The top front section of 30076's dismantled cab had both of its sides trimmed by a couple of inches, as part of the ongoing regauging (narrowing) process.

The dismantling of 30076’s cab sections is nearing completion and on 21st October, it was the subject of much attention with derusting etc taking place. Regarding 30075, four heavy lift jacks have been purchased. Arrangements to move these to Plym Valley Railway along with some sleepers for packing were made.
On 22nd October, P62 chairman John Rice reported: “Today a team of P62 volunteers travelled to the Plym Valley Railway to work on 30075. The manifold isolating valve, the steam brake pipe supply pipe and the cylinder drain cocks were removed from the loco to be brought back to Dorset for cleaning and repair. The loco was jacked up sufficiently to take the weight off the main springs and is now supported on sleepers. The spring is ready to be lifted out which will allow the worn hanger to be removed for repair. We will discuss with PVR how best to proceed from here after what was largely a successful day.”
On 29th October, there was much activity at Shillingstone, removing rivets from the spectacle plate of 30076's cab front, and some welding of the cab’s tool boxes took place. In 30076's firebox, grinding off of the boiler tube ends continued.